Physio resumed (by )

This morning at the ungodly hour of 8:30 am I had a physiotherapy appointment - the one for when I hurt my back in the autum. It turns out that becuase I am young there is still alot of water on the discs in my back making them prone to being squeezed out of place - the disc sort of popped out a bit and that was what cuased the pain. It gets worse when I sit for more than fifteen minutes or bend over too much (this is nuaghty bending from the waist rather than simply crouching) This is becuase those actions are pushing the disc back out where as the excersises I stole from my seperated pelvis excersises and walking help push it back in.

Unfortunatly the physio said that the muscles have all really spasmed around it so that I manipulation would put me out of action for too long so its the slowely slowely approach. Also apparently part of my lower spine is ridged and not flexing at all - this she said is probably just the way I am but that it needs sorting.

The stretches she did to test how bad things where tended to hurt and put pressure on my knees which lead to a discussion on that. I had been told back at Chelsea and Westminster hospital that I had refered pain from my lower back damage but the Physio said she thought there was actually something wronge with the knee joints themselves. This as you can imagine didn't exactly cheer me up. We desided that as they only hurt properlly once or twice a week unless its really cold its not currently worth worrying about.

She was suprised that I had such good range of movement considering how spasmed the muscles are and the pain I'm in but I pointed out I do my excersises still especially when things are really bad - I pointed out I'd had the pain management stuff in London. She nodded then asked me lots more questions including stuff about other joints.

So many of my joints have become unstable - though I dont really know what that means. I am in for more grulling and painful physio and this time its hourly for one excersise, two hourly for others and twice daily for yet more - plus pacing walking so as not to activate the pelvis which still decides to click painfully if I do too much - sigh.

Poor Ella got dragged to the appointment with me at stupid o'clock but went into PAinswick to photograph things - we then walked back to Cranham which I think was two and something miles but I may be wronge.

mums treatment (by )

Today mum's radiotherapy finished so no more daily trips to the hospital to be nuked! The radiotherapy will continue to have an affect for another three weeks so I am resisting going to see her with Jean right at this point in time as she is a bit snotty.

Help Appreciated (by )

Seth and Ella have been helping us clear out the upstairs of our house - unfortunatly becuase my back and pelvis started acting up as I tried to do a lot of the packing up and clearing myself at the weekend and stuff.

Also Alaric has had to work and so with me being stuck in bed for the first part of today not as much as could have been done was :/

Thanks anyway guys.

Bad News From the Electrician (by )

Well the Electrician came along today and said that he can't just do the extra bits down stairs that I wanted - ie more power points etc... the lighting and everything is in a right mess as it is the old rubber insulated wires from the 50-60's so thats all the lighting and the upstairs of the house that have to be done :( The whole lot obviously isnt covered by the insurance and comes too £2100 which I obviously dont have plus I'm not happy as I have no why of really varyfying all of this - he also said that the house isn't earthed properlly which is something had been suspected previously.

I only have £700 as well so if it does all need doing I'm not sure where I'm going to find the rest. The bedroom definatly needs doing though as the light has stopped working and kills any lightbulb thats put into it :/

Also upstairs is obviously pretty packed as it has all the things that where on shelves and stuff downstairs that where whisked upstairs and have since been turned over several times to find things - this all has to shift along with half the furniture :/ Not entirely sure how I'm going to organise all of this now.

edit: upon Als return home the electrician changed his mind about the office having to be touched as it was converted in the 1980's and so is sort of fine - this dropped the price by about half.

Kitchen Say Bye-Bye! (by )

Over half the kitchen is now ripped out!

Ripping out the Kitchen

This means we get to see the stones and pipes that where previously hidden - some repointing is unfortunatly needed here as there is a bit of a crack and stuff here.

The Pipes!

This is where the wall cupboards where ripped out and it was thick with black congelled cobwebs and others horrors that lurked in the strange little cavity we found!

The horrors that lurk!

The bottom step and half the kitchen still need to come out but we are definatly making progress here :)

WordPress Themes

Creative Commons Attribution-NonCommercial-ShareAlike 2.0 UK: England & Wales
Creative Commons Attribution-NonCommercial-ShareAlike 2.0 UK: England & Wales